headerSsrResult
Ad

Examples Of Process Control In Manufacturing

supplierLogo
Shenzhen Yuetian Micro Technology Co., Ltd.
Guangdong, countryFlag CN
4.9/5
verifiedSupplier
Multispecialty Supplier
4 yrs
10+ staff
500+
CE FCC
Warranty available
Finished product inspection
Supplier assessment procedures
On-time delivery
99%
Reorder rate
54%
Response time
≤2h
Online revenue
US $1,400,000+
Main products
PLC, PAC, & Dedicated Controllers
PLC, PAC, & Dedicated Controllers
Relays
Relays
Human Machine Interfaces & Industrial PCs
Human Machine Interfaces & Industrial PCs
1/2
VR
Top sponsor listing
supplierLogo
Fuzhou Fouwell Technology Co., Ltd.
Fujian, countryFlag CN
4.9/5
verifiedSupplier
Multispecialty Supplier
2 yrs
40+
Warranty available
ODM service available
Full customization
Finished product inspection
Supplier assessment procedures
supplierLogo
Guangzhou Borsen Technology Co., Ltd.
Guangdong, countryFlag CN
5.0/5
1 yr
On-time delivery
100%
Reorder rate
23%
Response time
≤1h
Online revenue
US $60,000+
Main products
PLC, PAC, & Dedicated Controllers
Input and Output(IO)
Control Cables
Other Industrial Components
Variable Frequency Drivers
Connectors
supplierLogo
Shenzhen Yuetian Micro Technology Co., Ltd.
Guangdong, countryFlag CN
4.9/5
verifiedSupplier
Multispecialty Supplier
4 yrs
10+ staff
500+
FCC
Warranty available
Finished product inspection
Supplier assessment procedures
On-time delivery
99%
Reorder rate
54%
Response time
≤2h
Online revenue
US $1,400,000+
1/2
VR
supplierLogo
Shenzhen Guanglianghong Automatic Equipment Co., Ltd
Guangdong, countryFlag CN
4.7/5
verifiedSupplier
Multispecialty Supplier
3 yrs
40+
Warranty available
Finished product inspection
Supplier assessment procedures
supplierLogo
Maoming Suneng Automation Technology Co., Ltd.
Guangdong, countryFlag CN
4.7/5
1 yr
On-time delivery
96%
Reorder rate
66%
Response time
≤3h
Online revenue
US $30,000+
Main products
PLC, PAC, & Dedicated Controllers
Human Machine Interfaces & Industrial PCs
Variable Frequency Drivers
Other Electrical Equipment
supplierLogo
Wuhan Hantuo Automation System Co., Ltd.
Hubei, countryFlag CN
1 yr
On-time delivery
100%
Reorder rate
<15%
Response time
≤4h
Online revenue
US $4,000+
Main products
PLC, PAC, & Dedicated Controllers
Variable Frequency Drivers
AC Motors
Human Machine Interfaces & Industrial PCs
No supplier images available
supplierLogo
Hubei Qingcang Automation Technology Co., Ltd.
Hubei, countryFlag CN
1 yr
On-time delivery
100%
Reorder rate
-
Response time
≤1h
Online revenue
-
Main products
PLC, PAC, & Dedicated Controllers
Other Electrical Equipment
Other Fabrication Services
Moulds
supplierLogo
Xiamen Yiqingchen Trading Co., Ltd.
Fujian, countryFlag CN
4.7/5
1 yr
On-time delivery
100%
Reorder rate
36%
Response time
≤1h
Online revenue
US $150,000+
Main products
PLC, PAC, & Dedicated Controllers
Other Electrical Equipment
No supplier images available
supplierLogo
Nanjing Baikuo International Trade Co., Ltd.
Jiangsu, countryFlag CN
5.0/5
1 yr
On-time delivery
75%
Reorder rate
<15%
Response time
≤2h
Online revenue
US $4,000+
Main products
PLC, PAC, & Dedicated Controllers
Contactors
supplierLogo
Hunan Dixi Automation Equipment Co., Ltd.
Hu Nan, countryFlag CN
5.0/5
2 yrs
On-time delivery
88%
Reorder rate
28%
Response time
≤3h
Online revenue
US $40,000+
Main products
PLC, PAC, & Dedicated Controllers
Other Electrical Equipment
Power Distribution Equipment
Variable Frequency Drivers
Human Machine Interfaces & Industrial PCs
Industrial Power Supplies
supplierLogo
Xiamen Luhengpeng Network Technology Co., Ltd.
Fujian, countryFlag CN
4.8/5
1 yr
On-time delivery
96%
Reorder rate
33%
Response time
≤1h
Online revenue
US $80,000+
Main products
PLC, PAC, & Dedicated Controllers
No supplier images available
supplierLogo
Shenzhen Youro Technology Co., Ltd
Guangdong Province, countryFlag CN
5.0/5
verifiedSupplier
Multispecialty Supplier
2 yrs
ODM service available
Supplier assessment procedures
On-time delivery
100%
Reorder rate
56%
Response time
≤1h
Online revenue
US $380,000+
supplierLogo
BRISYNERGY AUTOMATION PTE. LTD.
singapore, countryFlag SG
15 yrs
On-time delivery
-
Reorder rate
-
Response time
≤12h
Online revenue
-
Main products
PLC, PAC, & Dedicated Controllers
Other Electrical Equipment
Human Machine Interfaces & Industrial PCs
Other Sensors
Other Access Control Products
Inverters & Converters
supplierLogo
Xiamen Change Network Technology Co., Ltd.
FUJIAN, countryFlag CN
5.0/5
5 yrs
On-time delivery
100%
Reorder rate
50%
Response time
≤8h
Online revenue
US $70,000+
Main products
Other Electrical Equipment
PLC, PAC, & Dedicated Controllers
Other Electronic Components
No supplier images available
supplierLogo
Xiamen Qianzijie Network Technology Co., Ltd.
Fujian, countryFlag CN
5.0/5
2 yrs
On-time delivery
100%
Reorder rate
16%
Response time
≤1h
Online revenue
US $100,000+
Main products
PLC, PAC, & Dedicated Controllers
Circuit Breakers
No supplier images available
supplierLogo
Shenzhen Kason Electronic Technology Co., Limited
Guangdong, countryFlag CN
4.9/5
verifiedSupplier
Multispecialty Supplier
3 yrs
80+
FCC
Finished product inspection
supplierLogo
Boxun (Hong Kong) Technology Limited
HONGKONG, countryFlag HK
5.0/5
1 yr
On-time delivery
100%
Reorder rate
44%
Response time
≤2h
Online revenue
US $150,000+
Main products
PLC, PAC, & Dedicated Controllers
Relays
Proximity Sensors
supplierLogo
Shantou Sikinta Automation Equipment Co., Ltd.
Guangdong, countryFlag CN
4.7/5
verifiedSupplier
Multispecialty Supplier
6 yrs
350+
CE
Supplier assessment procedures
supplierLogo
Quanzhou Zhantong E-Commerce Co., Ltd.
Fujian, countryFlag CN
4.6/5
1 yr
On-time delivery
86%
Reorder rate
25%
Response time
≤3h
Online revenue
US $10,000+
Main products
PLC, PAC, & Dedicated Controllers
Other Electrical Equipment
Circuit Breakers
No supplier images available

About examples of process control in manufacturing

Where to Find Process Control Systems Suppliers in Manufacturing?

China remains a central hub for industrial automation components, with key supplier clusters concentrated in Shenzhen, Guangzhou, and Fuzhou. These regions host vertically integrated supply chains specializing in programmable logic controllers (PLCs), process automation controllers (PACs), human-machine interfaces (HMIs), and associated I/O modules. Shenzhen and Guangzhou, in particular, benefit from proximity to semiconductor distributors and electronics manufacturing services (EMS), enabling rapid component sourcing and assembly.

The ecosystem supports both standard and customized control system solutions, with many suppliers operating multi-disciplinary production lines capable of PCB assembly, firmware programming, and functional testing. This integration reduces lead times for PLC modules and controller units to 15–30 days for standard orders. Localized sourcing of core materials—such as industrial-grade microcontrollers, relays, and display panels—contributes to 20–35% lower unit costs compared to equivalent Western-sourced systems. Buyers also gain flexibility in order volume, with select suppliers accommodating low MOQs down to one unit for niche or legacy models.

How to Choose Process Control Systems Suppliers?

Procurement decisions should be guided by technical validation, operational reliability, and transactional safeguards:

Technical Compliance & Product Range
Confirm supplier specialization in relevant control hardware categories: PLCs, PACs, HMIs, VFDs, and I/O modules. Prioritize partners offering traceable original equipment manufacturer (OEM) components or fully tested compatible replacements. For regulated industries, ensure products meet applicable standards such as IEC 61131-3 for control programming and CE marking for electromagnetic compatibility (EMC).

Operational Performance Metrics
Evaluate supplier responsiveness and fulfillment consistency using verifiable data:

  • On-time delivery rate ≥95%
  • Average response time ≤2 hours
  • Reorder rate >20% indicating customer retention
  • Documented quality testing protocols for incoming and finished goods

Cross-reference product listings with actual shipment histories and verify revenue scale as an indicator of operational stability. Suppliers with annual online revenues exceeding US $100,000+ typically maintain dedicated logistics and after-sales support teams.

Transaction Safeguards
Utilize secure payment methods that include inspection windows before final disbursement. Request sample units to validate build quality, firmware functionality, and compatibility with existing control networks. For bulk procurement, confirm availability of technical documentation—including wiring diagrams, communication protocols (e.g., Modbus, Profibus), and firmware update procedures.

What Are the Leading Process Control Systems Suppliers?

Company Name Main Products On-Time Delivery Response Time Reorder Rate Online Revenue Min. Order Price Range (USD)
Shenzhen Yuetian Micro Technology Co., Ltd. PLC, PAC, Relays, HMIs & Industrial PCs 99% ≤2h 54% US $1,400,000+ 2 pieces $108–$328
Guangzhou Borsen Technology Co., Ltd. PLC, PAC, VFDs, I/O Modules, Connectors 100% ≤1h 23% US $60,000+ 1 piece $100–$600
Fuzhou Fouwell Technology Co., Ltd. PLC Controller Modules, Industrial Controls 95% ≤2h 30% US $100,000+ 1 piece $24–$462
Shenzhen Guanglianghong Automatic Equipment Co., Ltd PLC Motherboards, Power Supplies, I/O Components 100% ≤3h <15% US $160,000+ 1 piece $30–$380

Performance Analysis
Shenzhen Yuetian Micro Technology demonstrates strong market confidence with the highest reorder rate (54%) and substantial transaction volume, indicating consistent product quality and service reliability. Guangzhou Borsen leads in responsiveness (≤1h) and perfect on-time delivery, making it suitable for urgent replacements or time-sensitive integrations. Fuzhou Fouwell offers broad compatibility with legacy industrial systems, evidenced by its diverse PLC module offerings. While Shenzhen Guanglianghong achieves 100% delivery performance, its sub-15% reorder rate suggests potential gaps in long-term customer satisfaction—warranting additional due diligence for repeat business needs.

FAQs

How to verify process control system supplier reliability?

Validate supplier claims through documented compliance records, available product testing reports, and verifiable transaction history. Assess technical capability by requesting detailed specifications, firmware versions, and communication protocol support. Review customer feedback focusing on post-purchase technical assistance and defect resolution timelines.

What is the typical lead time for process control components?

Standard items ship within 7–15 days. Custom-configured or programmed units may require 20–30 days depending on firmware development and testing requirements. Air freight adds 5–10 days for international delivery.

Do suppliers support customization for industrial control applications?

Yes, select suppliers offer firmware preloading, terminal labeling, and enclosure modifications. High-volume orders may include OEM branding and tailored communication protocols. Confirm engineering support availability before order placement.

What are common MOQs for PLC modules and controllers?

MOQs range from 1 piece for specialized modules to 2+ pieces for cost-optimized configurations. Volume discounts typically apply at 10+ units. Suppliers may waive MOQs for sample validation under trade assurance programs.

How to evaluate product authenticity and quality?

Request batch testing certificates, inspect packaging for OEM markings, and verify chip model numbers against manufacturer datasheets. Functional testing should include input/output response, communication stability, and power cycling endurance.