Extra Large Square Ice Cube Trays
CN
About extra large square ice cube trays
Where to Find Extra Large Square Ice Cube Tray Suppliers?
China remains the central hub for silicone-based kitchenware manufacturing, with key production clusters in Fujian, Guangdong, and Zhejiang provinces. These regions host vertically integrated supply chains specializing in food-grade silicone molding, enabling efficient production of extra large square ice cube trays. Xiamen and Shenzhen in Guangdong are notable for rapid prototyping and export logistics, while Ningbo serves as a major port city facilitating containerized shipments to global markets.
The industrial ecosystem supports high-volume output through automated injection molding lines and standardized quality testing for BPA-free compliance. Suppliers benefit from localized access to raw silicone, packaging materials, and certification labs, reducing lead times by 15–25% compared to offshore alternatives. Average production cycles range from 15–25 days post-sample approval, with air freight options available for urgent orders (7–10 days globally). Buyers gain flexibility in MOQs, customization depth, and multi-product bundling due to overlapping tooling infrastructure across suppliers.
How to Choose Extra Large Square Ice Cube Tray Suppliers?
Procurement decisions should be guided by structured evaluation criteria focused on operational reliability, material compliance, and customization capability.
Material & Safety Compliance
Verify that products are manufactured from food-grade silicone compliant with FDA 21 CFR §177.2600 and EU Regulation (EC) No 1935/2004. While explicit ISO 22000 or LFGB certification is rarely listed, suppliers routinely provide test reports confirming BPA-free, phthalate-free, and lead-free composition. Request third-party lab results (e.g., SGS or Intertek) for critical buyer markets.
Production Capacity and Scalability
Assess supplier infrastructure using verifiable metrics:
- Monthly output capacity exceeding 100,000 units for stable replenishment
- In-house mold design and CNC tooling capabilities for custom shapes
- On-time delivery performance above 90% to ensure supply chain continuity
Cross-reference online transaction volume indicators (e.g., US $100,000+ annual digital revenue) as proxies for operational scale.
Customization and Branding Flexibility
Leading suppliers support full OEM/ODM services including:
- Color matching (Pantone or RAL standards)
- Logo embossing or label printing
- Tray configuration (4–8 cavity designs)
- Packaging redesign (blister cards, retail boxes)
What Are the Best Extra Large Square Ice Cube Tray Suppliers?
| Company Name | Main Products | Online Revenue | On-Time Delivery | Reorder Rate | Avg. Response | MOQ Range | Price Range (USD) | Customization Options |
|---|---|---|---|---|---|---|---|---|
| Spec-Tech (Xiamen) Co., Ltd. | Ice Cream Tools (327), Cake Tools (241) | US $40,000+ | 100% | 18% | ≤1h | 10–100 pcs | $0.70–0.89 | Limited |
| Protecting Your Electronics (PYE) Electronic Technology Co., Ltd. (Shenzhen) | Full OEM/ODM Support | US $130,000+ | 91% | 18% | ≤5h | 10–100 pcs | $0.52–1.58 | High (color, size, logo, packaging) |
| Ningbo Transynergy Import & Export Co., Ltd. | Custom Packaging & Labeling | US $120,000+ | 100% | 32% | ≤2h | 10–500 pcs | $0.26–1.25 | High (material, color, graphic design) |
| Shenzhen Varywell Technology Co., Ltd. | Pet Bowls & Feeders (1040), Cake Tools (325) | US $160,000+ | 89% | 28% | ≤3h | 10–20 pcs | $1.46–2.50 | Moderate (logo, color, release ease) |
| Ningbo Dazen Technology Co., Ltd. | Custom Molds & Design | US $120,000+ | 100% | <15% | ≤3h | 20–50 pcs | $0.55–3.86 | High (shape, size, packaging, vacuum sealing) |
Performance Analysis
Spec-Tech and Ningbo Transynergy demonstrate perfect on-time delivery records, making them reliable for time-sensitive contracts. Ningbo Transynergy stands out with a 32% reorder rate—the highest among peers—indicating strong customer satisfaction and consistent product quality. Shenzhen-based PYE and Varywell offer extensive customization but vary in responsiveness, with PYE lagging at ≤5h average reply time despite high digital transaction volume.
Ningbo Dazen commands premium pricing up to $3.86/unit, reflecting advanced design capabilities for large-block molds and vacuum-sealed configurations. In contrast, budget-friendly options like the $0.26 tray from Ningbo Transynergy cater to cost-driven buyers willing to accept higher MOQs (500 pcs). Suppliers in Zhejiang (Ningbo) generally offer broader design adaptability, while Fujian and Guangdong firms prioritize fast turnaround and inventory readiness.
FAQs
How to verify ice cube tray material safety?
Request documentation proving compliance with food contact regulations such as FDA 21 CFR §177.2600 or EU No 1935/2004. Third-party test reports from accredited labs (SGS, BV, TÜV) should confirm absence of BPA, phthalates, and heavy metals. Conduct batch sampling upon receipt to validate ongoing compliance.
What is the typical MOQ for customized trays?
Custom orders typically require minimum quantities of 500–1,000 pieces depending on complexity. Simple color or logo changes may start at 100 units, while structural redesigns (e.g., cavity count, lid integration) often require 1,000+ units to justify mold development costs.
Can suppliers produce samples before mass production?
Yes, most suppliers offer pre-production samples within 7–10 days. Sample fees range from $50–$150 and are often refundable against future orders. Buyers should evaluate sample durability, demolding ease, and dimensional accuracy before approving tooling.
Do manufacturers support private labeling and retail packaging?
Yes, all listed suppliers offer private label services including custom branding, UPC coding, and retail-ready packaging. Full graphic design support is available from Ningbo Transynergy and Ningbo Dazen, with file requirements typically in AI or PDF format (CMYK, 300 dpi).
What are standard lead times after order confirmation?
Standard production lead time is 15–25 days following deposit payment and final artwork approval. Rush orders with expedited molding may reduce timelines to 10–14 days at additional cost. Sea freight adds 25–35 days to North America/Europe; air freight delivers in 7–10 days.









