Headsup Display Producer
About headsup display producer
Where to Find Heads-Up Display Producers?
China remains the central hub for heads-up display (HUD) manufacturing, with key production clusters concentrated in Shenzhen and Guangzhou. These regions host vertically integrated supply chains specializing in automotive electronics, enabling rapid prototyping and scalable output. Shenzhen-based suppliers leverage proximity to semiconductor and PCB sourcing networks, reducing component lead times by 20–30% compared to non-specialized regions. Guangzhou’s industrial ecosystem supports OBD2 and GPS-integrated HUDs through established partnerships with sensor and connectivity module providers.
Manufacturers in these zones typically operate dedicated SMT lines and automated assembly units, supporting monthly production capacities ranging from 50,000 to 200,000 units per facility. The integration of surface-mount technology (SMT), injection molding for optical components, and laser calibration systems ensures consistent optical clarity and data projection accuracy. Buyers benefit from localized logistics, with Shenzhen Port and Nansha Port offering direct export routes to North America, Europe, and Southeast Asia, maintaining average shipping lead times of 10–18 days via sea freight.
How to Choose Heads-Up Display Suppliers?
Effective supplier selection requires structured evaluation across technical, operational, and transactional dimensions:
Production & Technical Capability
Confirm ownership of in-house production lines, including SMT placement machines, reflow ovens, and functional testing rigs. Suppliers advertising "own production line" should provide evidence of facility control—such as process flow documentation or video audits—to differentiate from trading companies. Prioritize manufacturers with R&D capabilities in firmware integration (OBD2, GPS, Bluetooth) and optical design, particularly for augmented reality (AR)-style projection systems.
Quality Assurance Protocols
Verify adherence to international standards such as ISO 9001 for quality management and IATF 16949 for automotive-specific processes. Although not always explicitly stated, compliance with RoHS and CE directives is essential for market access in Europe and North America. Request test reports for EMI/RFI performance, thermal stability (-20°C to +70°C operational range), and vibration resistance (per ISO 16750-3). On-time delivery rates exceeding 95% correlate strongly with stable production workflows and inventory management.
Procurement Terms & Risk Mitigation
Evaluate minimum order quantities (MOQ), which range from 1 piece for sample validation to 50+ units for bulk pricing. Lead times average 7–15 days post-payment confirmation, depending on customization level. Utilize secure payment methods with milestone verification, especially for first-time engagements. Suppliers with response times under 4 hours and reorder rates below 15% indicate efficient operations but may lack strong customer retention—cross-check with buyer reviews focusing on post-sale support and defect resolution.
What Are the Leading Heads-Up Display Producers?
| Company Name | Location | Main Products | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Product Range | Price Range (USD) |
|---|---|---|---|---|---|---|---|---|
| Shenzhen Zhiqian Technology Co., Ltd. | Shenzhen, CN | Head Up Displays, Auto Electronics, Diagnostic Tools | US $10,000+ | 96% | ≤4h | <15% | 5 models | $5.29–$26.99 |
| Guangzhou Feichen Tech. Co., Ltd. | Guangzhou, CN | Diagnostic Tools, Head Up Displays, Vehicle Electronics | US $40,000+ | 89% | ≤4h | <15% | 3 models | $18.00–$25.27 |
| Shenzhen Vjoy Car Electronics Limited | Shenzhen, CN | GPS Navigation, Head Up Displays, Auto Electronics | US $90,000+ | 96% | ≤6h | <15% | 5 models | $8.90–$130.00 |
| Shenzhen Sulianxing Innovation Technology Co., Ltd. | Shenzhen, CN | Head Up Displays, Auto Electronics, Car Black Box | US $1,000+ | 100% | ≤1h | <15% | 3 models | $2.95–$4.60 |
| Xuchang Yuhang Plastics Co., Ltd. | Xuchang, CN | Wig Displays, Mannequins, Training Heads | US $10,000+ | 97% | ≤8h | <15% | Incorrect product category | N/A |
Performance Analysis
Shenzhen-based firms dominate both responsiveness and product specialization, with Sulianxing achieving a 100% on-time delivery rate and sub-one-hour response time—indicative of streamlined internal coordination. Vjoy Car Electronics offers the widest price range, including high-end GPS-enabled HUDs at $130/unit, suggesting investment in advanced navigation integration. Zhiqian Technology provides competitive entry-level pricing from $5.29, suitable for budget-focused procurement. Notably, Xuchang Yuhang Plastics appears misclassified, listing mannequins and wig displays despite keyword alignment, underscoring the need for manual product verification before engagement.
FAQs
How to verify heads-up display manufacturer authenticity?
Request factory audit reports, equipment lists, and business licenses. Conduct live video calls to inspect production floors and packaging areas. Validate claimed certifications through official databases or third-party verification services.
What is the typical MOQ and lead time for HUD orders?
Standard MOQs start at 1 piece for samples and scale to 50+ units for volume discounts. Production lead time averages 7–12 days after deposit receipt, with additional 3–5 days for quality inspection and packing.
Can HUDs be customized with private labels or firmware?
Yes, most producers offer OEM/ODM services including custom logos, housing colors, user interface layouts, and firmware features (e.g., speed alert thresholds, unit conversion). Minimum branding MOQs typically begin at 500 units.
Do suppliers support global shipping and compliance?
Established manufacturers ship worldwide via express, air, or sea freight under FOB, CIF, or DDP terms. Confirm that products meet destination-market requirements for electromagnetic compatibility (EMC) and vehicle electronics safety standards.
Are samples available before mass production?
Samples are generally available at 1–3x unit cost, refundable against future orders above specified volumes. Allow 5–10 days for sample preparation and 3–7 days for international delivery via courier.









