Servo Voltage Transformer
TR
About servo voltage transformer
Where to Find Servo Voltage Transformer Suppliers?
China remains the central hub for servo voltage transformer manufacturing, with key production clusters concentrated in Guangdong, Jiangsu, and Shanghai. These regions host vertically integrated supply chains that support efficient production of precision power regulation equipment. Dongguan and Kunshan, in particular, have emerged as specialized centers for industrial transformers, combining advanced winding technologies with automated assembly lines to ensure consistent output quality.
The ecosystem benefits from proximity to raw material suppliers—such as copper, silicon steel, and insulating resins—as well as a dense network of component manufacturers. This localization reduces lead times by 20–30% compared to offshore alternatives and supports flexible order scaling. Most facilities operate under ISO 9001-aligned quality management systems, with typical delivery cycles ranging from 15 to 30 days for standard configurations. Buyers also benefit from low minimum order quantities (MOQs), often starting at 1–5 units, enabling cost-effective prototyping and small-batch procurement.
How to Choose Servo Voltage Transformer Suppliers?
Selecting reliable partners requires rigorous evaluation across technical, operational, and transactional dimensions:
Technical Compliance
Verify adherence to international electrical standards such as IEC 61558 and IEEE C57.12.01. For export markets, confirm CE or RoHS certification where applicable. Request test reports on critical parameters including voltage regulation accuracy (±1–3%), response time (<1 second), and harmonic distortion levels. Ensure design compatibility with input/output voltages (e.g., 380V to 220V) and phase configurations (single or three-phase).
Production Capability Audits
Assess infrastructure maturity through the following indicators:
- Facility size exceeding 2,000m² indicating scalable operations
- In-house coil winding, core stacking, and varnish dipping capabilities
- Integration of digital control modules for intelligent servo regulation
Cross-reference on-time delivery rates (target ≥95%) and response times (ideally ≤2 hours) to gauge operational responsiveness.
Transaction Safeguards
Prioritize suppliers with verifiable performance metrics, including reorder rates below 25% suggesting stable customer satisfaction. Use secure payment methods with milestone-based releases tied to shipment milestones. Conduct sample testing to validate load stability, thermal performance under continuous operation, and surge protection functionality before full-scale orders.
What Are the Best Servo Voltage Transformer Suppliers?
| Company Name | Main Products | Online Revenue | On-Time Delivery | Reorder Rate | Avg. Response | Min. Order | Price Range (USD) |
|---|---|---|---|---|---|---|---|
| Dongguan Kunmai Power Supply Co., Ltd. | Voltage Regulators/Stabilizers, Transformers, Industrial Power Supplies | US $8,000+ | 100% | <15% | ≤1h | 5 pcs | N/A |
| Shanghai Fengchuang Industrial Co., Ltd. | Common Mode Chokes, Switching Power Supply, AC-DC Converters | US $1,000+ | 100% | <15% | ≤2h | 5 pcs | $55–$98 |
| Kunshan Yayada Electric Appliance Technology Development Co., Ltd. | Switching Power Supply, Power Distribution Equipment, Relays | US $80,000+ | 100% | 22% | ≤1h | 1 pc | $40.60–$276.90 |
| SUPERFINE INTERNATIONAL | Isolation Transformers, Inverters & Converters, Digital Stabilizers | Not specified | Unverified | Unverified | ≤6h | 1 unit | $40–$750 |
| Kunshan Pinzhe Industrial Materials Co., Ltd. | Transformers, Circuit Breakers, Contactors, ATS Systems | US $6,000+ | 100% | 50% | ≤6h | 2–10 pcs | $38.02–$225.63 |
Performance Analysis
Dongguan Kunmai and Kunshan Yayada demonstrate strong reliability with 100% on-time delivery and sub-2-hour response times, positioning them as preferred choices for time-sensitive procurement. Yayada stands out with higher online transaction volume (US $80,000+), suggesting extensive market engagement and product variety across single-phase and three-phase models (3KVA to 20KVA). Shanghai Fengchuang offers competitive pricing starting at $55 with low MOQs, ideal for budget-conscious buyers seeking standardized units. In contrast, SUPERFINE INTERNATIONAL lacks verified performance data, introducing uncertainty in fulfillment consistency despite offering high-voltage and oil-cooled variants. Kunshan Pinzhe, while maintaining perfect delivery records, has a 50% reorder rate, potentially indicating room for improvement in post-sale satisfaction or product fit.
FAQs
How to verify servo voltage transformer supplier reliability?
Cross-check claimed certifications with official databases. Request factory inspection reports or video audits highlighting production workflows, testing benches, and inventory management. Analyze buyer feedback focusing on long-term performance, fault recurrence, and technical support responsiveness.
What is the typical lead time for servo voltage transformers?
Standard units are typically delivered within 15–25 days after order confirmation. Custom designs involving specific voltage ratios, enclosures, or cooling systems may require 30–45 days depending on complexity and component availability.
Can suppliers accommodate custom specifications?
Yes, most established manufacturers support customization of input/output voltages, kVA ratings, mounting types, and protective features (e.g., overload, short-circuit, and overtemperature protection). Provide detailed technical drawings or operational requirements to initiate engineering review.
Do servo voltage transformers require special packaging for export?
Yes, units should be packed in moisture-resistant, shock-absorbing crates with internal bracing to prevent coil displacement during transit. Confirm compliance with international shipping standards, especially for sea freight where humidity and vibration pose risks.
Are samples available before bulk ordering?
Most suppliers offer samples at full or partial cost, refundable upon subsequent orders. Sample pricing typically reflects 1.5x to 2x unit production cost, with lead times of 7–14 days for ready-made models.









