Under Bench Ice Maker
CN
About under bench ice maker
Where to Find Under Bench Ice Maker Suppliers?
China remains the central hub for under bench ice maker manufacturing, with key production clusters concentrated in Guangdong, Jiangsu, and Shanghai. These regions host vertically integrated supply chains encompassing compressor fabrication, sheet metal processing, and refrigeration system assembly. Guangdong—particularly Guangzhou and Jiangmen—accounts for over 40% of commercial ice machine exports, supported by mature industrial ecosystems that reduce component procurement lead times by up to 30%. Proximity to port infrastructure in Nansha and Shekou enables efficient containerized shipping, with average export processing times of 7–10 days.
Manufacturers in these zones specialize in both compact residential units and high-capacity commercial models, ranging from 36kg to 500kg daily output. Facilities typically integrate CNC stamping, automated welding, and foam insulation injection lines, enabling consistent build quality across batch sizes. Buyers benefit from localized access to stainless steel suppliers and certified refrigerant charging stations, contributing to a 15–25% cost advantage compared to equivalent European or North American production. Standard lead times for bulk orders range from 25 to 40 days, depending on customization scope and compressor availability.
How to Choose Under Bench Ice Maker Suppliers?
Effective supplier evaluation requires systematic assessment across technical, operational, and transactional dimensions:
Technical & Compliance Verification
Confirm adherence to international safety and performance standards, including CE, ETL, and RoHS certifications. For markets in North America and Europe, UL-listed components and NSF-compliant materials are essential for regulatory clearance. Request test reports for condenser efficiency, power consumption (measured in kWh/100kg), and noise levels (dB(A)). Validate refrigerant type—R-410A and R-134a are most common—and ensure compliance with local environmental regulations such as F-Gas or EPA SNAP.
Production Capacity Assessment
Evaluate supplier infrastructure based on the following benchmarks:
- Monthly production capacity exceeding 500 units for sustained volume fulfillment
- In-house capabilities in sheet metal forming, tube bending, and electrical control panel integration
- Dedicated quality inspection stations for leak testing, electrical safety, and cycle endurance
Cross-reference online revenue indicators and reorder rates: suppliers with reorder rates above 25% and response times under 8 hours demonstrate reliable service consistency.
Customization & Transaction Security
Assess flexibility for OEM/ODM requests, including color finishes (e.g., brushed stainless steel), logo embossing, voltage adjustments (110V vs. 220V), and control panel language localization. Prioritize suppliers offering third-party transaction protection and DDP (Delivered Duty Paid) shipping options, particularly for Middle East or South American destinations. Pre-shipment inspections via SGS or Intertek are recommended for orders exceeding 50 units.
What Are the Best Under Bench Ice Maker Suppliers?
| Company Name | Main Products (Listings) | On-Time Delivery | Response Time | Reorder Rate | Online Revenue | Price Range (USD) | Min. Order |
|---|---|---|---|---|---|---|---|
| Shanghai Jie Qin Refrigeration Equipment Manufacturing Co., Ltd. | Ice Machines (92) | 100% | ≤13h | - | - | $260–750 | 1 set |
| Guangzhou Sinuolan Technology Co., Ltd. | Refrigeration Equipment (1017) | 50% | ≤2h | 27% | US $140,000+ | $450–729 | 1 piece |
| Jiangmen Kolice Refrigeration Equipment Co., Ltd. | Ice cream machine (244) | 97% | ≤8h | 16% | US $150,000+ | $621–3,836 | 1 set |
| Guangzhou Universal Venture Holding Co.,Ltd | Ice Machines (85) | 100% | ≤7h | 33% | US $190,000+ | $320–2,356 | 1–5 pieces |
| Changzhou Fenfei Technology Co., Ltd. | Customization options available | 93% | ≤3h | <15% | US $530,000+ | $140–600 | 2–100 pieces |
Performance Analysis
Shanghai Jie Qin and Guangzhou Universal stand out with 100% on-time delivery records, indicating robust production planning and logistics execution. Changzhou Fenfei offers the broadest customization range—including material, size, logo, and packaging adjustments—and leads in online sales volume, suggesting strong market validation. While Guangzhou Sinuolan has a relatively low on-time delivery rate (50%), its sub-2-hour response time reflects high engagement, beneficial for iterative design collaboration. Jiangmen Kolice targets premium segments with high-end pricing, while Changzhou Fenfei provides entry-level solutions at scale, with MOQs as high as 100 units for base models. Buyers seeking reliability should prioritize suppliers with verified delivery performance above 93% and clear documentation of compliance certifications.
FAQs
How to verify under bench ice maker supplier reliability?
Cross-check claimed certifications (CE, ETL, ISO) through official databases or request scanned copies with traceable certification numbers. Demand factory audit reports or video walkthroughs highlighting production lines, QC checkpoints, and inventory management. Analyze transaction history for consistency in order fulfillment and customer feedback related to after-sales support.
What is the typical minimum order quantity (MOQ)?
MOQs vary significantly: many suppliers accept single-unit orders for sample testing, while others require 2–5 units for standard configurations. High-volume or customized models may require MOQs of 50–100 units, particularly for private labeling or voltage-specific builds.
Do suppliers offer customization options?
Yes, leading manufacturers support customization in stainless steel finish, unit dimensions, ice cube shape (cubed, cylindrical, flake), control interface language, and branding. Some provide full OEM services, including custom enclosures and packaging design. Confirm tooling costs and NRE (non-recurring engineering) fees before approval.
What are standard lead times for production and shipping?
Production lead time averages 25–35 days post-deposit. Air freight delivery takes 5–10 days for samples; sea freight requires 20–35 days depending on destination port. Expedited production (15–20 days) is available from select suppliers at a 10–15% premium.
Can suppliers handle global logistics and import compliance?
Most established exporters manage end-to-end logistics under FOB, CIF, or DDP terms. Confirm responsibility for customs clearance, duties, and inland transportation. Ensure product documentation includes CE declarations, electrical schematics, and refrigerant compliance certificates required by local authorities.









