Computer Controlled Machines
CN
About computer controlled machines
Where to Find Computer Controlled Machines Suppliers?
China leads global production of computer controlled machines, with specialized manufacturing clusters in Jiangsu, Guangdong, and Shandong provinces. These regions host vertically integrated industrial ecosystems that combine precision engineering, automation expertise, and scalable manufacturing infrastructure. Jiangsu excels in textile automation equipment, hosting advanced knitting and weaving machine producers leveraging local supply chains for servo motors, control systems, and structural components. Guangdong’s Dongguan and Ganzhou hubs specialize in sewing and embroidery machinery, benefiting from proximity to electronics manufacturers and injection molding facilities.
The concentration of component suppliers, R&D centers, and logistics networks within 50km radii enables rapid prototyping and order fulfillment. Buyers benefit from lead times averaging 30–45 days for standard units, with localized sourcing reducing material costs by 15–25% compared to Western counterparts. Industrial zones support both high-volume procurement and low-MOQ customization, making them ideal for OEMs, contract manufacturers, and testing laboratories seeking reliable access to CNC-driven equipment across multiple applications.
How to Choose Computer Controlled Machines Suppliers?
Selecting qualified suppliers requires a structured evaluation of technical, operational, and transactional performance indicators.
Technical & Functional Compliance
Verify that machines meet international safety and performance standards such as CE or ISO 9001, particularly for deployment in regulated markets. For testing and laboratory equipment, confirm compliance with ASTM or IEC benchmarks (e.g., tensile strength testing per ASTM E8). Review product documentation for control system specifications—PLC integration, software interface compatibility, and programmable logic functions are critical for automation workflows.
Production and Engineering Capability
Assess supplier infrastructure through the following criteria:
- Minimum factory area of 3,000m² to support assembly and testing lines
- In-house design teams capable of custom firmware or mechanical modifications
- Integration of servo-hydraulic, electronic control, and multi-axis motion systems
Cross-reference online revenue data and reorder rates (>30% indicates strong customer retention) to validate market acceptance and after-sales reliability.
Transaction and Quality Assurance
Prioritize suppliers offering third-party payment protection and documented quality inspections. Analyze on-time delivery records (target ≥98%) and response times (≤5 hours preferred) as proxies for operational efficiency. Request sample units to evaluate build quality, software responsiveness, and noise/vibration metrics before scaling orders. For used or refurbished machines, verify service history and component replacements.
What Are the Best Computer Controlled Machines Suppliers?
| Company Name | Main Products | On-Time Delivery | Reorder Rate | Response Time | Online Revenue | Customization Options | Sample Availability | MOQ |
|---|---|---|---|---|---|---|---|---|
| Jiangsu Gomor Textile Technology Co., Ltd. | Knitting Machines, Winding Machines, Weaving Machines | 100% | 33% | ≤5h | US $20,000+ | Yes (multi-gauge, ribbing, flat knitting, logo integration) | Available | 1 set |
| Longnan County Shengming Machinery Equipment Co., Ltd. | Sewing Machines, Injection Molding Machines | 100% | 37% | ≤4h | US $30,000+ | Limited | Available | 1 set |
| Dongguan BH Mechanical Equipment Company Limited | Sewing Machines, Embroidery Machines | 100% | <15% | ≤6h | US $50,000+ | No | Available | 1 set |
| Jinan Chenda Testing Machine Manufacturing Co., Ltd. | Tensile Testing Machines, Universal Testing Equipment | 100% | <15% | ≤4h | US $20,000+ | Yes (load capacity, software interface) | Available | 1 set/piece |
| Ganzhou Fuxing Intelligent Equipment Co., Ltd. | Sewing Machines, CNC Lathes, Used Equipment | 100% | - | ≤3h | - | Limited | Available | 1–5 sets |
Performance Analysis
Longnan County Shengming stands out with the highest reorder rate (37%) and fast response time (≤4h), indicating strong buyer satisfaction in the sewing machinery segment. Jiangsu Gomor offers extensive customization for textile automation, including multi-system flat knitting and logo-integrated designs, making it ideal for apparel manufacturers requiring brand-specific outputs. Jinan Chenda specializes in precision testing equipment with programmable servo-hydraulic controls, suitable for materials laboratories needing ASTM-compliant validation. Dongguan BH and Ganzhou Fuxing focus on cost-effective new and used sewing systems, though lower reorder rates suggest potential gaps in long-term service support. All top-tier suppliers maintain 100% on-time delivery, underscoring reliability in export execution.
FAQs
How to verify computer controlled machine supplier reliability?
Cross-check ISO or CE certifications with issuing bodies and request test reports for key subsystems (e.g., motor efficiency, control board stability). Evaluate supplier credibility through verifiable transaction histories, customer reviews focusing on technical support, and video audits of production lines.
What is the typical lead time for computer controlled machines?
Standard units ship within 30–45 days after order confirmation. Custom configurations may require 50–60 days depending on software development, component sourcing, and testing protocols. Air freight reduces delivery to 7–10 days; sea freight remains optimal for containerized shipments.
Do suppliers offer customization for computer controlled machines?
Yes, select manufacturers provide tailored firmware, mechanical adjustments, and interface programming. Jiangsu Gomor supports multi-gauge knitting systems and logo embedding, while Jinan Chenda allows load range and software UI modifications for testing apparatus. Submit detailed technical drawings and functional requirements prior to quotation.
Can I request samples before bulk ordering?
Most suppliers offer sample units for evaluation, typically at full price or partially subsidized. Sample costs are often credited toward future bulk orders exceeding five units. Expect 15–25 days for sample production and global air shipping within one week.
What are common MOQs for computer controlled machines?
Minimum Order Quantities range from 1 set for standard models to 5 sets for discounted configurations. Some suppliers waive MOQs for sample testing. High-volume buyers can negotiate tiered pricing starting at 10+ units.









