Fully Automatic Chakli Making Machine
About fully automatic chakli making machine
Where to Find Fully Automatic Chakli Making Machine Suppliers?
China remains a dominant force in the manufacturing of automated food processing equipment, with key supplier clusters concentrated in Henan province. This region hosts a high density of industrial machinery manufacturers specializing in grain-based snack and flatbread production systems. The proximity to raw material suppliers, metal fabrication hubs, and Zhengzhou’s national logistics center enables streamlined production and export operations. Suppliers in this zone benefit from vertically integrated supply chains—supporting everything from sheet metal stamping to electrical control panel assembly—reducing component procurement lead times by up to 30%.
These ecosystems facilitate rapid prototyping and scalable production, making them ideal for both small-batch custom orders and high-volume commercial deployments. Buyers can expect typical lead times of 25–40 days for standard configurations, with localized sourcing reducing overall production costs by 15–25% compared to equivalent machinery sourced from Southeast Asia or India. The cluster's specialization in electrically driven, PLC-controlled food machines ensures consistent technological alignment across suppliers.
How to Choose Fully Automatic Chakli Making Machine Suppliers?
Selecting reliable partners requires adherence to structured evaluation criteria:
Technical Compliance & Quality Assurance
Verify that suppliers adhere to international electrical and food safety standards. While not all list certifications explicitly, prioritize those demonstrating compliance with ISO 9001 for quality management. For markets requiring regulatory approval (EU, North America), confirm CE marking and compatibility with food-grade materials (e.g., SUS304 stainless steel contact surfaces). Request documentation on motor insulation class (IP54 or higher recommended) and thermal overload protection mechanisms.
Production Capability Assessment
Evaluate operational scale through measurable indicators:
- Minimum factory area exceeding 1,000m² to support dedicated assembly lines
- In-house engineering teams capable of PLC programming and mechanical design adjustments
- Integrated testing protocols for dough extrusion consistency, temperature control accuracy, and cycle timing calibration
Cross-reference listed response times (≤2 hours preferred) and on-time delivery performance (100% reported by top-tier suppliers) as proxies for operational reliability.
Transaction Security & After-Sales Support
Utilize secure payment frameworks such as escrow services to mitigate risk during initial transactions. Assess after-sales capability by confirming availability of technical manuals, remote troubleshooting support, and spare parts inventory. A reorder rate above 18% indicates customer retention and product dependability. Sample validation is critical—test output uniformity, chakli coil integrity, and cleaning accessibility before scaling procurement.
What Are the Best Fully Automatic Chakli Making Machine Suppliers?
| Company Name | Location | Verified Status | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Price Range (USD) | Min. Order |
|---|---|---|---|---|---|---|---|---|
| Henan Gondor Machinery Co., Ltd. | Henan, CN | Custom Manufacturer | US $530,000+ | 100% | ≤2h | 18% | $549–1,279 | 1 set/piece |
| Saidashi Machinery (Henan) Co., Ltd. | Henan, CN | - | US $100,000+ | 100% | ≤3h | 20% | $426–4,960 | 1 set |
| Zhengzhou Qiongdan Machinery Co., Ltd. | Henan, CN | - | US $10,000+ | 100% | ≤2h | <15% | $550–9,000 | 1 set |
| Sumec Industrial INC | - | - | - | - | ≤1h | - | $550–1,100 | 1 set |
| YANN TECHNOLOGY LLC | - | - | - | - | ≤1h | - | $650–8,000 | 1 set |
Performance Analysis
Henan Gondor Machinery stands out with verified customization capabilities, strong online revenue, and an 18% reorder rate, indicating repeat buyer confidence. Saidashi Machinery demonstrates scalability with a broad price range and 20% reorder rate, suggesting robust field performance across diverse client segments. Zhengzhou Qiongdan offers premium high-capacity models ($4,000–$9,000), though lower reorder rates may reflect niche adoption. Sumec and YANN TECHNOLOGY exhibit fast responsiveness (≤1h) but lack verifiable delivery metrics, presenting higher due diligence requirements. Suppliers reporting 100% on-time delivery and sub-3-hour response times are better positioned for time-sensitive deployments.
FAQs
How to verify fully automatic chakli machine supplier reliability?
Cross-check declared capabilities with transaction history, response consistency, and delivery performance. Request evidence of past shipments via logistics documentation or third-party trade verification. Prioritize suppliers offering customization options (material, color, logo, packaging), which indicate flexible production infrastructure.
What is the average sampling timeline?
Standard sample production typically takes 15–25 days, depending on complexity. Machines with multi-stage extrusion or dual heating zones may require up to 35 days. Air freight shipping adds 7–10 days internationally. Some suppliers offer pre-production videos or live testing sessions as alternatives to physical samples.
Can suppliers ship fully automatic chakli making machines worldwide?
Yes, most established manufacturers support global shipping via air or sea freight under FOB or CIF terms. Confirm inclusion of export packaging, voltage adaptation (220V/380V, 50Hz/60Hz), and CE-compliant control panels for seamless customs clearance and integration.
Do manufacturers provide free samples?
Free samples are uncommon due to machine size and cost. Buyers typically pay full or partial fees for sample units. Some suppliers credit the sample cost toward bulk orders exceeding 5–10 sets, improving procurement economics upon validation.
How to initiate customization requests?
Submit detailed specifications including desired output capacity (pcs/hour), dough type (rice, wheat, besan), chakli diameter (20–40mm typical), power requirements, and footprint constraints. Leading suppliers provide CAD drawings or operational schematics within 72 hours and can modify feed screw design, heating element layout, and automation level accordingly.









