True Cube Ice Maker
About true cube ice maker
Where to Find True Cube Ice Maker Suppliers?
China remains the global hub for true cube ice maker manufacturing, with concentrated supplier clusters in Jiangsu, Shanghai, and Henan provinces. These regions host vertically integrated production ecosystems that combine refrigeration engineering expertise with advanced sheet metal fabrication and PLC-controlled automation systems. Jiangsu and Shanghai-based suppliers benefit from proximity to core component manufacturers—such as Bitzer and Danfoss compressor facilities—reducing procurement lead times by 15–20% compared to offshore alternatives.
The industrial clusters support scalable production through co-located supply chains for stainless steel, condensers, evaporators, and electrical control panels. This integration enables manufacturers to maintain tight tolerances in freezing cycle consistency and ice ejection mechanisms critical for producing uniform true cube ice (typically 22×22×22 mm). Buyers gain access to flexible production runs—from compact countertop units (20–50 kg/day) to industrial-scale systems (up to 2,000 kg/24h)—with average lead times of 25–40 days for containerized orders. Localized logistics networks further enhance export efficiency, particularly via Shanghai and Ningbo ports.
How to Choose True Cube Ice Maker Suppliers?
Procurement decisions should be guided by rigorous evaluation of technical, operational, and transactional indicators:
Technical Compliance & Component Quality
Verify use of certified refrigeration components, including Copeland or Bitzer compressors and Danfoss expansion valves, which directly impact system longevity and energy efficiency. Prioritize suppliers specifying Siemens or Schneider electrical components and PLC controls, indicating adherence to industrial-grade standards. CE or CB certification is essential for market compliance in Europe and North America. Request documentation on refrigerant type (commonly R404A or R134a) and confirm alignment with local environmental regulations.
Production Capability Assessment
Evaluate infrastructure maturity using the following benchmarks:
- Minimum factory area exceeding 3,000m² for stable batch production
- In-house capabilities in welding, CNC bending, and refrigerant charging
- Dedicated R&D or technical teams supporting customization
Cross-reference these with on-time delivery rates above 95% and response times under 3 hours to assess operational reliability.
Transaction Risk Mitigation
Utilize secure payment frameworks such as escrow services to ensure product verification prior to full disbursement. Analyze online transaction volume and reorder rates: suppliers with over US $100,000 in verifiable annual revenue demonstrate consistent order fulfillment. Require sample testing to validate ice clarity, freezing cycle duration (typically 7–12 minutes per batch), and bin capacity accuracy before scaling procurement.
What Are the Best True Cube Ice Maker Suppliers?
| Company Name | Location | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Customization Options | Key Components | Price Range (USD) |
|---|---|---|---|---|---|---|---|---|
| Luohe Ejin Machinery Co., Ltd. | Henan, CN | US $140,000+ | 98% | ≤1h | <15% | Yes | Color, size, logo, packaging | $250–1,500 |
| Jiangsu Eternity Import & Export Co., Ltd. | Jiangsu, CN | US $50,000+ | 100% | ≤2h | <15% | Yes | Air cooling, refrigerant, compressor, plug | $170–3,200 |
| Shanghai Icema Refrigeration Technology Co., Ltd. | Shanghai, CN | US $1,400,000+ | 95% | ≤2h | 24% | Yes | Bitzer compressor, Siemens PLC, Danfoss valve | $850–3,069 |
| Shanghai Kendall Electromechanical Equipment Co., Ltd. | Shanghai, CN | US $2,000+ | Not specified | ≤16h | <15% | Yes | Bitzer compressor, Siemens PLC, Danfoss valve | $1,000–3,710 |
| Nantong Wuding Technology Co., Ltd. | Jiangsu, CN | US $60,000+ | 100% | ≤3h | 16% | WICE brand series | Standard commercial components | $220–901 |
Performance Analysis
Shanghai Icema leads in technical sophistication and sales volume, offering high-end configurations with premium components and a 24% reorder rate—indicating strong post-sale satisfaction. Luohe Ejin stands out for responsiveness (≤1h) and competitive mid-range pricing, ideal for buyers prioritizing communication efficiency. Jiangsu Eternity and Nantong Wuding offer cost-effective entry points with 100% on-time delivery records, suitable for standardized orders. Shanghai Kendall provides technically robust systems but slower response times, suggesting potential bottlenecks in customer service. For mission-critical applications, prioritize suppliers listing Bitzer compressors and Siemens PLCs, as these correlate with longer MTBF (mean time between failures) and easier serviceability.
FAQs
How to verify true cube ice maker supplier reliability?
Cross-check component brands (e.g., Bitzer, Danfoss, Siemens) against official distributor lists. Request evidence of quality management systems, such as ISO 9001, and review third-party inspection reports if available. Analyze transaction history, focusing on sustained online revenue and verified delivery performance.
What is the typical sampling timeline?
Standard sample production takes 10–20 days depending on customization level. Add 7–14 days for international shipping via express carriers. Complex modifications involving control panel programming or bin redesign may extend timelines to 30 days.
Can suppliers accommodate global voltage and plug standards?
Yes, most suppliers offer power supply adaptations for 110V/60Hz, 220V/50Hz, or 380V/3-phase inputs. Plug types (NEMA, Schuko, BS) and language-specific control interfaces are commonly customizable at no additional cost for bulk orders.
Do manufacturers provide free samples?
Free samples are rare for industrial equipment. Expect to pay 50–70% of the unit price for sampling, which may be credited toward future orders exceeding 5 units. Some suppliers waive fees for long-term partnership commitments.
How to initiate customization requests?
Submit detailed specifications covering daily output (kg/24h), cooling method (air/water-cooled), refrigerant preference, electrical requirements, and physical dimensions. Reputable suppliers will respond with CAD drawings or 3D renderings within 5–7 business days and provide prototype validation reports upon request.









