Types Of Production System In Production Management
About types of production system in production management
Where to Find Production System Suppliers?
China remains the global epicenter for production system manufacturing, with key industrial clusters in Jiangsu, Anhui, and Guangdong provinces driving innovation and cost efficiency. Jiangsu hosts a high concentration of intelligent automation integrators, particularly around Changzhou and Suzhou, where advanced R&D in food processing and packaging lines enables rapid prototyping and customization. Anhui has emerged as a hub for grain and bakery equipment systems, leveraging localized agricultural supply chains to optimize machinery design for dough handling and continuous baking operations.
These regional ecosystems support vertically integrated production—from CNC machining and control panel assembly to full-line integration—reducing component lead times by up to 30%. Suppliers within these zones typically operate within tightly networked industrial parks, allowing access to certified steel fabricators, PLC engineers, and logistics providers within a 50-kilometer radius. This proximity translates into standard delivery windows of 45–60 days for complete turnkey systems, with cost advantages of 20–35% over equivalent European or North American-built lines due to lower labor and overhead expenses.
How to Choose Production System Suppliers?
Procurement decisions should be guided by rigorous technical and operational assessments:
System Design & Technical Compliance
Verify that suppliers demonstrate expertise in core production system types: batch, continuous flow, job shop, and mass customization configurations. Request process flow diagrams and layout simulations for proposed systems. For export markets, ensure compliance with IEC 60204 (electrical safety) and CE marking where applicable. Control systems should integrate standard PLC platforms (Siemens, Allen-Bradley) with HMI interfaces for traceability and fault diagnostics.
Production Capability Verification
Assess supplier infrastructure through documented evidence:
- Minimum factory area exceeding 3,000m² to support assembly of multi-station lines
- In-house engineering teams capable of mechanical, electrical, and software integration
- Proven experience with hygienic design standards (e.g., 3A, EHEDG) for food-grade applications
Cross-reference claimed capabilities with on-time delivery performance (target ≥98%) and reorder rates as indicators of customer satisfaction.
Quality Assurance & Transaction Security
Prioritize suppliers implementing ISO 9001-certified quality management systems. Demand test reports for critical subsystems—such as filling accuracy, metering consistency, or pasteurization efficacy—under real-world operating conditions. Utilize secure transaction mechanisms that release payment only after site acceptance testing. Pre-shipment inspections by third-party agencies (e.g., SGS, BV) are recommended for orders exceeding $50,000 to validate functionality and safety.
What Are the Best Production System Suppliers?
| Company Name | Main Products | On-Time Delivery | Response Time | Reorder Rate | Online Revenue | Price Range (Min Order) | Product Count |
|---|---|---|---|---|---|---|---|
| Changzhou Zhenglong Intelligent Equipment Technology Co., Ltd. | Food processing lines, Plastic/Metal Product Processing Lines, Packaging Lines | 100% | ≤4h | - | - | $1 (1 piece) | 4 |
| Jiangmen Tings Drinking Water Equipment Co., Ltd. | Filling Machines, Water Treatment Machinery, Beverage Processing Lines | 100% | ≤7h | 33% | US $170,000+ | $12,500–$34,900 (1 unit) | 5 |
| Anhui Jinke Foodstuff Machinery Co., Ltd. | Food processing lines, Grain Product Making Machines, Baking Equipment | 100% | ≤18h | <15% | US $7,000+ | $13,000–$111,111 (1 piece) | 5 |
| Shanghai Easireal Technologies Co., Ltd. | Food processing lines, Pasteurizers, Sterilizers, Filling Machines | 100% | ≤12h | 66% | US $580,000+ | $45,000–$198,000 (1 set) | 4 |
| Grandee Packaging Machinery (Suzhou) Co., Ltd. | Filling Machines, Labeling Machines, Wrapping Machines | 100% | ≤12h | - | - | $5,000–$55,200 (1 set) | 4 |
Performance Analysis
Suppliers like Shanghai Easireal demonstrate strong market confidence with a 66% reorder rate and high transaction volume, indicating reliable system performance and post-sale support. Jiangmen Tings offers mid-range solutions focused on water and beverage lines, balancing affordability with proven delivery consistency. Changzhou Zhenglong stands out for low MOQ flexibility ($1/1pc), ideal for pilot testing or modular upgrades. Anhui Jinke specializes in tortilla and bread production systems but shows lower reorder activity, suggesting room for improvement in long-term client retention. Grandee Packaging provides targeted filling and packaging automation, suitable for beverage producers seeking integration-ready units.
FAQs
What types of production systems are available from Chinese suppliers?
Suppliers offer all major configurations: continuous flow systems (e.g., bottling, juice processing), batch production lines (dairy, sauces), job shop setups for small-batch customization, and hybrid automated systems integrating feeding, mixing, filling, and palletizing functions.
What is the typical minimum order quantity (MOQ)?
MOQ varies by system complexity. Modular components may require only one piece, while full turnkey lines typically demand one complete set. Some suppliers offer single-machine trials before full line procurement.
How long does it take to receive a production system?
Lead time ranges from 45 to 90 days depending on customization level. Standard water or juice lines ship in 45–60 days; fully customized food processing systems with integrated controls may require 75–90 days.
Can suppliers customize production lines?
Yes, most suppliers provide engineering services to adapt throughput capacity, material compatibility (stainless steel grades), control interfaces, and footprint dimensions. Provide detailed process requirements including output rate, raw material form, and packaging format.
Do suppliers provide installation and training?
Many offer remote commissioning support via video guidance. On-site installation and operator training are often available at additional cost, typically quoted separately based on technician travel and duration.









