A Nugget Ice Maker
About a nugget ice maker
Where to Find Nugget Ice Maker Suppliers?
China remains the central hub for nugget ice maker manufacturing, with key production clusters in Guangdong, Zhejiang, and Shanghai. These regions host vertically integrated supply chains that streamline component sourcing—from compressors and evaporators to molds and control panels—enabling rapid prototyping and high-volume output. Shenzhen and Ningbo specialize in compact, consumer-grade countertop units, while Shanghai and Nantong focus on commercial-scale machines with daily outputs exceeding 1,000 lbs.
The industrial ecosystem supports economies of scale, with many suppliers operating facilities equipped for full-cycle production, including injection molding, sheet metal fabrication, and final assembly. This integration reduces lead times to 25–40 days for standard orders and allows for cost efficiencies, with production expenses typically 20–30% lower than equivalent Western-manufactured models. Proximity to major ports like Ningbo-Zhoushan and Shanghai facilitates efficient global shipping via FOB or CIF terms.
How to Choose Nugget Ice Maker Suppliers?
Selecting reliable suppliers requires a structured evaluation based on technical capability, quality assurance, and transactional reliability:
Quality & Compliance Verification
Confirm adherence to international standards such as CE, RoHS, and UL (where applicable). While not all suppliers list certifications explicitly, demand test reports for electrical safety, energy efficiency, and noise levels. For commercial buyers, ensure compliance with NSF or ETL standards is achievable upon request.
Production Capacity Assessment
Evaluate supplier infrastructure through available metrics:
- Minimum factory area supporting continuous batch production
- In-house R&D teams capable of product customization (e.g., capacity tuning, voltage adaptation)
- Monthly output capacity aligned with order volume (from 500 units for SMEs to 5,000+ for large distributors)
- Cross-reference online revenue data and reorder rates as proxies for market acceptance and operational stability
Order Terms & Customization Flexibility
Assess minimum order quantities (MOQ), which range from 1 set for commercial models to 100–500 pieces for residential units. Prioritize suppliers offering OEM services—including logo printing, color variation, packaging design, and user interface localization—for brand differentiation. Confirm whether tooling fees apply for custom molds or PCB modifications.
Transaction Safeguards
Utilize secure payment methods such as Alibaba Trade Assurance or third-party escrow until product inspection is completed. Favor suppliers with documented on-time delivery rates above 95%, response times under 2 hours, and transparent communication channels. Request samples before bulk procurement to validate build quality, ice production rate, and noise performance.
What Are the Best Nugget Ice Maker Suppliers?
| Company Name | Location | Main Products (Listings) | Price Range (USD) | MOQ | On-Time Delivery | Avg. Response | Reorder Rate | Online Revenue |
|---|---|---|---|---|---|---|---|---|
| Shenzhen Aurotech Technology Co., Ltd. | Guangdong, CN | Ice Makers (77), Fans (91) | $81.66–133.40 | 100–500 sets/pieces | 100% | ≤2h | <15% | US $130,000+ |
| Shanghai Bingsu Refrigeration Technology Co., LTD. | Shanghai, CN | Ice Machines (408), Ice Makers (73) | $1,260–6,460 | 1 set | 100% | ≤1h | <15% | US $20,000+ |
| Cixi Jirui Electric Appliance Co., Ltd. | Zhejiang, CN | Ice Crushers (195), Ice Makers (135) | $230–1,000 | 2–10 pieces/cartons | 50% | ≤6h | <15% | US $1,000+ |
| Ningbo Yingyi International Trade Co., Ltd. | Zhejiang, CN | Customizable Ice Makers | $80–120 | 100 pieces | 100% | ≤2h | 27% | US $210,000+ |
| Nantong Wuding Technology Co., Ltd. | Jiangsu, CN | Ice Machines (380), Commercial Equipment | $165–1,519 | 1 set | 100% | ≤3h | <15% | US $60,000+ |
Performance Analysis
Shenzhen Aurotech and Ningbo Yingyi dominate the mid-tier consumer market with competitive pricing and strong digital presence, evidenced by high online revenues and fast response times. Shanghai Bingsu and Nantong Wuding specialize in high-capacity commercial systems, offering single-set ordering flexibility ideal for restaurant chains or hospitality procurement. Despite lower reported reorder rates, their 100% on-time delivery records indicate consistent fulfillment performance.
Cixi Jirui offers low MOQs and broad product diversification but presents higher risk due to only 50% on-time delivery performance. Buyers should conduct deeper due diligence, including sample testing and factory audits, when engaging this supplier. Ningbo Yingyi stands out for customization capabilities, supporting branding and design adjustments—critical for private-label strategies.
FAQs
How to verify nugget ice maker supplier reliability?
Cross-check claimed certifications with official databases. Request product test reports covering compressor efficiency, ice yield accuracy, and electrical safety. Analyze transaction history, focusing on consistent on-time delivery and buyer feedback related to after-sales support.
What is the typical sampling timeline?
Standard samples are produced within 7–15 days. Customized units with branding or modified configurations may require 20–30 days. Air freight adds 5–10 days for international delivery.
Can suppliers ship globally?
Yes, most suppliers support worldwide shipping via air or sea freight. Confirm Incoterms (FOB, CIF, DDP) and verify compatibility with local voltage (110V/220V) and plug standards. Sea freight is recommended for container loads to minimize per-unit logistics costs.
Do manufacturers offer free samples?
Free samples are rare. Most suppliers charge 1.5–2x the unit price for sampling, which may be partially refunded upon placement of a qualifying bulk order. Negotiate sample fees during initial discussions.
How to initiate customization requests?
Provide detailed specifications: desired ice production rate (lbs/day), dimensions, power requirements, cabinet material, and branding elements. Reputable suppliers will respond with engineering drawings, component lists, and tooling cost estimates within 3–5 business days.










