Kesser Ice Cube Maker
CN
About kesser ice cube maker
Where to Find Kesser Ice Cube Maker Suppliers?
China serves as the global manufacturing hub for commercial and industrial ice-making equipment, with key supplier clusters concentrated in Shanghai, Guangdong, and Jiangsu provinces. These regions host vertically integrated production ecosystems specializing in refrigeration technology, enabling streamlined access to core components such as compressors, condensers, and evaporators. Shanghai-based manufacturers leverage proximity to advanced R&D centers and port logistics, facilitating rapid export cycles. Guangdong’s Pearl River Delta region benefits from a dense network of electrical and mechanical component suppliers, reducing assembly lead times by 15–25% compared to non-specialized regions.
The industrial clusters support scalable production across output ranges—from compact 25kg/day units to high-capacity 20-ton industrial systems. Suppliers typically operate automated assembly lines with in-house testing protocols for cooling efficiency, refrigerant integrity, and power consumption. Buyers gain access to flexible configurations including air-cooled and water-cooled models, multiple cube sizes (standard, bullet, flake), and customization in voltage (single/three-phase), plug types, and control panels. Average production lead times range from 15 to 30 days for standard orders, with expedited fulfillment available for pre-stocked models.
How to Choose Kesser Ice Cube Maker Suppliers?
Effective supplier selection requires structured evaluation based on technical, operational, and transactional criteria:
Technical Specifications & Compliance
Verify adherence to international standards such as CE, RoHS, and ISO 9001 for quality management. For North American or EU markets, confirm compatibility with local electrical codes (e.g., 110V/60Hz or 220V/50Hz) and refrigerant regulations (e.g., use of R404A, R410A, or eco-friendly alternatives). Request documentation for compressor brands (e.g., Bitzer, Danfoss), PLC controls (Siemens, Schneider), and insulation materials to assess durability and energy efficiency.
Production & Customization Capability
Evaluate suppliers based on:
- Capacity to produce across output tiers (25kg to 20,000kg per 24 hours)
- In-house engineering support for OEM/ODM projects (logo, color, packaging, labeling)
- Material specifications: stainless steel housing (SUS304 preferred), aluminum evaporators, or food-grade plastic components
- Ability to modify cooling type, ice shape, and power input based on regional requirements
Cross-reference product listings with on-time delivery rates (target ≥98%) and response times (ideally ≤3 hours) to gauge operational responsiveness.
Transaction Security & Quality Assurance
Prioritize suppliers offering third-party inspection services and escrow payment options. Analyze reorder rates as an indicator of customer satisfaction—rates above 30% suggest consistent performance. Request sample units to evaluate build quality, noise levels, and ice clarity before full-scale procurement. Confirm post-delivery support, including spare parts availability and technical troubleshooting.
What Are the Best Kesser Ice Cube Maker Suppliers?
| Company Name | Location | Verified Type | Online Revenue | On-Time Delivery | Avg. Response | Reorder Rate | Key Capabilities |
|---|---|---|---|---|---|---|---|
| Shanghai Keshi Refrigeration Equipment Co., Ltd. | Shanghai, CN | Custom Manufacturer | US $240,000+ | 98% | ≤3h | <15% | Customization (color, plug, logo); industrial-use labeling; split-machine packaging; multiple cooling types |
| Guangdong Taihe Refrigeration Technology Co., Ltd. | Guangdong, CN | Multispecialty Supplier | US $50,000+ | 100% | ≤2h | 33% | Single-phase options; design flexibility; refrigeration type variation; label and capacity customization |
| Jiangsu Eternity Import & Export Co., Ltd. | Jiangsu, CN | Multispecialty Supplier | US $50,000+ | 100% | ≤2h | <15% | Air cooling systems; refrigerant-specific designs; compressor branding; graphic and logo integration |
| Zhengzhou Yize Machinery Co., Ltd. | Zhengzhou, CN | Multispecialty Supplier | US $450,000+ | 98% | ≤2h | 31% | OEM services; material and size adjustments; packaging and branding customization |
| Shanghai Kendall Electromechanical Equipment Co., Ltd. | Shanghai, CN | Multispecialty Supplier | US $2,000+ | Not specified | ≤16h | <15% | High-end components (Bitzer, Siemens, Danfoss); commercial air cooling; precise power input control |
Performance Analysis
Guangdong Taihe and Jiangsu Eternity demonstrate exceptional reliability with 100% on-time delivery and sub-2-hour response times, making them ideal for time-sensitive procurement. Zhengzhou Yize leads in aftermarket satisfaction with a 31% reorder rate and substantial online revenue, indicating strong market trust. Shanghai Keshi, positioned as a custom manufacturer, offers deep OEM capabilities but has lower repeat order volume. For high-volume buyers, prioritize suppliers with documented use of premium components (e.g., Bitzer compressors, Siemens PLCs) and ISO-aligned quality systems. For niche applications (e.g., mobile or portable units), verify field performance through product-specific testing and site audits.
FAQs
How to verify kesser ice cube maker supplier reliability?
Cross-check certifications (CE, ISO) with official registries. Request factory audit reports or video tours to validate production infrastructure. Assess transaction history through verified revenue data, on-time delivery metrics, and customer feedback on after-sales service and product consistency.
What is the typical MOQ and pricing range?
Minimum Order Quantity (MOQ) is commonly 1 set or piece, with select high-capacity models requiring 2 sets. Pricing varies significantly by output: portable units start at $155, mid-range commercial machines average $500–$850, and industrial systems exceed $2,000. Volume discounts are typically available for orders above 5 units.
Can suppliers customize ice cube makers for specific markets?
Yes, most suppliers offer comprehensive customization including voltage adaptation, plug configuration, bilingual labels, branded housings, and packaging tailored to regional retail or hospitality needs. Lead time for customized units may extend by 5–10 days depending on complexity.
Do manufacturers provide samples?
Sample availability depends on model and supplier policy. Some offer paid samples (typically 30–70% of unit cost) refundable against future orders. Full-functional prototypes for custom designs may require 10–15 days for production and testing.
What are the common shipping methods and delivery timelines?
Sea freight is standard for bulk shipments (FCL/LCL), with transit times of 20–40 days depending on destination. Air freight is viable for samples or urgent orders, delivering within 5–10 days. Confirm Incoterms (FOB, CIF) early to allocate shipping and insurance responsibilities accurately.









